Process for Integrating Constructability into the Design Phase in High-Rise Concrete Buildings: Focused on Temporary Work
International Journal of Concrete Structures and Materials ( IF 3.4 ) Pub Date : 2018-12-01 , DOI: 10.1186/s40069-018-0317-9
Jin Woong Lee , Kyuman Cho , Taeyon Hwang , Ju-yeon Han , Taehoon Kim

With the increase in high-rise building construction, failure to consider constructability in the design phase can result in huge wastes in the construction phase, as well as losing opportunities for design improvement. However, existing approaches for reflecting constructability rely heavily on reviews, resulting in an inefficient decision-making process. Thus, by considering appropriate timing and detail levels when applying construction knowledge, this study proposes a process for integrating constructability activities related to temporary work into the design phase in high-rise concrete buildings. Through an investigation of information-dependency relationships, 22 constructability activities were linked with 33 design activities. Further, these activities’ implementation processes were constructed based on optimized information flows from a partitioned dependency structure matrix. The results of this study can help a project team address constructability issues at the appropriate time during the design process and will contribute to improving the efficiency of the overall project operation in high-rise building construction.

中文翻译:

将可施工性整合到高层混凝土建筑设计阶段的过程:专注于临时工作

随着高层建筑施工的增多,在设计阶段不考虑可施工性会造成施工阶段的巨大浪费,并失去设计改进的机会。然而,反映可施工性的现有方法严重依赖审查,导致决策过程效率低下。因此,通过在应用施工知识时考虑适当的时间安排和详细程度,本研究提出了将与临时工作相关的可施工性活动整合到高层混凝土建筑设计阶段的过程。通过对信息依赖关系的调查,22 项可施工性活动与 33 项设计活动相关联。更多,这些活动的实施过程是基于来自分区依赖结构矩阵的优化信息流构建的。这项研究的结果可以帮助项目团队在设计过程中的适当时间解决可施工性问题,并将有助于提高高层建筑施工中整体项目运营的效率。